Customer Service
7:30 AM - 4:30 PM PT
800.406.9377
E-mail | Home

 

> Home| > CMS | > About us | > Place Order | > News | >Services | > Resources | > Recycling Services


Specific Hazardous Material Training Program
per CFR 49 §172.700

All Hazardous Material Employees are required to receive specific hazardous material training every three (3) years or within ninety (90) days of starting a new hazmat position.

You will find all the hazardous material training information at the following location  http://www.myerscontainer.com/unpackaging.htm.  Once you have reviewed this information, please complete the following test.  Use the indicated hyperlinks to find the correct answers.  Once you submit the test, a confirmation will show your score.  If you get any of the questions incorrect you must start over on test until all answers are correct.  Once you successfully complete the test, the name and date of your certification will be posted at on your Partnership Page(tm). 

 

Date
First Name
Last Name
Company
Phone Number:
E-Mail Address:
Address:
City:
State:
Zip:

 

Question 1
Myers Container requires a minimum of 60 ft. lbs. stabilizing torque when assembly a openhead container.   http://www.myerscontainer.com/mccun.htm
True
False
Question 2
A hazmat employee is anyone who during the course of their job can effect the safe transportation of hazardous materials.  http://www.myerscontainer.com/uninfo.htm
True
False
Question 3
"1A1" in the UN Marking UN 1A1/Y1.5/150 represents "drum, steel, tighthead or tighthead steel drum."    http://www.myerscontainer.com/unmarking.htm
True
False
Question 4
"1.5" in the UN Marking UN 1A1/Y1.5/150 represents "the specific gravity placed of the product being packed into the container."    http://www.myerscontainer.com/unmarking.htm
True
False
Question 5
"150" in the UN Marking UN 1A1/Y1.5/150 represents the maximum rating hydrostatic pressure in kPa (kilopascals) rating of the the product being packed into the container.    http://www.myerscontainer.com/unmarking.htm
True
False
Question 6
The four tests that must be performed annually to a package design designated to transport liquids for non-bulk packaging are:  drop, stack, hydrostatic, leakproofness.    http://www.myerscontainer.com/untesting.htm
True
False
Question 7
Every drum designated for hazardous use must be leakproofness tested. http://www.myerscontainer.com/untesting.htm
True
False
Question 8
The maximum net mass that can be placed into a non-bulk container is 400 kilograms or 880 pounds. http://www.myerscontainer.com/uninfo.htm
True
False
Question 9
It is the responsibility of the packager/shipper, not the container manufacturer, to determine the proper package specification for each lading. The shipper determines that the drum is authorized, assembled and marked for packaging. The shipper may request a certificate of compliance from the manufacturer to demonstrate that each container conforms with the performance testing provisions in §178.600. . http://www.myerscontainer.com/unresponse.htm
True
False
Question 10
It is the shipper's responsibility to assemble the container for shipment in accordance with the manufacturer's instructions.  http://www.myerscontainer.com/unassemble.htm
True
False

 

Myers Container LLC
® Copyright, 2010
All rights reserved

Customer Service
800.406.9377
Contact Us | Home